Unloading The Cabinet(S) - Powerware 9155 User Manual

Parallel ups 8-15 kva
Hide thumbs Also See for 9155:
Table of Contents

Advertisement

Unloading the Cabinet(s)

The following tools are required for unloading the cabinet(s):
S
S
The UPS and
requires at least two people to safely remove the cabinets from the pallet.
To remove the UPS or EBM from the shipping pallet:
1.
2.
NOTE Be sure to retain the stabilizing bracket and hardware for later re-assembly onto the
cabinet.
®
EATON Powerware
9155 Parallel UPS (8–15 kVA) User's Guide
15 mm wrench or socket
7 mm nutdriver or socket
Extended Battery Module
Remove the two M10 bolts securing the stabilizing bracket to the
pallet (see Figure 2).
Figure 2. Removing the Stabilizing Bracket Bolts
Remove the four M4 screws securing the stabilizing bracket to the
cabinet rear panel and remove the bracket (see Figure 3). Retain the
hardware for later use.
C A U T I O N
(EBM) are heavy (see page 8). Unloading the cabinets
M10 Bolts
S
164201592 Rev C www.powerware.com
UPS SETUP
9

Advertisement

Table of Contents
loading

Table of Contents