Completing The Task - Fujitsu PRIMERGY RX900 S2 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX900 S2:
Table of Contents

Advertisement

Ê Remove the defective TPM board on the upper side of the baseboard.
I
The TPM spacer may remain on the baseboard.

14.5.4 Completing the task

Ê Perform the following procedures to complete the task:
1.
"Installing the TPM board" on page 269
2.
"Inserting the baseboard" on page 286
3.
"Installing the air guide" on page 287
4.
"Inserting the CPUMEMR guide" on page 288
5.
"Inserting the fan cage" on page 289
6.
"Connecting the cables to the baseboard" on page 290
7.
"Sliding the local service display inward" on page 291
8.
"Installing the I/O board" on page 243
9. Install the BBU holder, see
10. Install the PCI Riser, see
11. Install all expansion cards and dummy modules in PCIe slots #8 to #17,
see
"Expansion cards and BBU" on page 105
I
Make sure that you reinstall each card in the slots it was located
before the replacement.
12. Install all CPUMEMRs, see
I
Make sure that you reinstall each CPUMEMR in the slot it was
located before the replacement.
13. Install all PSUs, see
14.
"Closing the server" on page 47
15.
"Mounting the server in the rack" on page 49
16.
"Bringing the server back to operation" on page 51
17.
"Closing the rack door" on page 51
RX900 S2
"Expansion cards and BBU" on page 105
"Expansion cards and BBU" on page 105
"Removing the CPUMEMR" on page 190
"Installing a power supply unit" on page 55
Upgrade and Maintenance Manual
Baseboard
277

Advertisement

Table of Contents
loading

Table of Contents