Trane IntelliPak Installation, Operation And Maintenance Manual page 53

Intellipak series commercial rooftop air conditioners with cv, vav, or szvav controls
Hide thumbs Also See for IntelliPak:
Table of Contents

Advertisement

to overcome the trap losses and assure complete
condensate removal.
40 through 130 Ton units
Utilizes two steam coils stacked together.These two coils
must be piped in a parallel arrangement.The steps listed
below should be used in addition to the previous steps.
Figure 38
illustrates the recommended piping
configuration for the steam coils.
Figure 35. Hot water piping (20 - 75 Ton)
Figure 36. Hot water piping (90 - 130 Ton)
RT-SVX36K-EN
Installation
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents