Thermostatic Expansion Valves - Trane IntelliPak Installation, Operation And Maintenance Manual

Intellipak series commercial rooftop air conditioners with cv, vav, or szvav controls
Hide thumbs Also See for IntelliPak:
Table of Contents

Advertisement

Figure 117. 115 ton high operating pressure curve (all compressors and condenser fans "On")
COOLING CYCLE PRESSURE CURVE
COOLING CYCLE PRESSURE CURVE
550
550
500
500
450
450
400
400
350
350
300
300
250
90
100
110
250
90
100
110
Figure 118. 130 ton high operating pressure curve (all compressors and condenser fans "On")
COOLING CYCLE PRESSURE CURVE
COOLING CYCLE PRESSURE CURVE
COOLING CYCLE PRESSURE CURVE
550
550
550
500
500
500
450
450
450
400
400
400
350
350
350
300
300
300
250
90
100
110
250
250
90
90
100
100
110
110

Thermostatic Expansion Valves

The reliability and performance of the refrigeration system
is heavily dependent upon proper expansion valve
adjustment.Therefore, the importance of maintaining the
proper superheat cannot be over emphasized. Expansion
valves are preset at the factory. In typical applications, field
adjustment should not be required unless the valves are
replaced or damaged.
RT-SVX36K-EN
115 Ton Standard Capacity
105 Ton High Capacity
120
130
140
Suction Pressure, PSIG
120
130
140
Suction Pressure, PSIG
115 Ton Standard Capacity
130 Ton Standard Capacity
105 Ton High Capacity
120
130
140
Suction Pressure, PSIG
120
120
130
130
140
140
Suction Pressure, PSIG
Suction Pressure, PSIG
105 °F Ambient
95 °F Ambient
85 °F Ambient
75 °F Ambient
65 °F Ambient
150
160
170
180
150
160
170
180
105 °F Ambient
105 °F Ambient
105 °F Ambient
95 °F Ambient
95 °F Ambient
95 °F Ambient
85 °F Ambient
85 °F Ambient
85 °F Ambient
75 °F Ambient
75 °F Ambient
75 °F Ambient
65 °F Ambient
65 °F Ambient
65 °F Ambient
150
160
170
180
150
150
160
160
170
170
180
180
On air-cooled units, the expansion valves shipped
installed were factory set to control between 14-18°F at the
ARI full load rating conditions (approximately 45°/125°F
saturated suction/discharge).
On evaporative condenser units, the expansion valves
shipped installed were factory set to control between 18-
22°F at the ARI full load rating conditions (approximately
45°/105°F saturated suction/discharge). At part load,
expect lower superheat. Systems operating with lower
Unit Start Up
147

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents