Trane IntelliPak Installation, Operation And Maintenance Manual page 103

Intellipak series commercial rooftop air conditioners with cv, vav, or szvav controls
Hide thumbs Also See for IntelliPak:
Table of Contents

Advertisement

Figure 59. Condenser fan location with human interface designator
20 Tons
25-30 Tons
40 Tons
50 Tons
60-75 Tons
5. Use
Table 42, p. 96
to program the Supply Fan for
operation by scrolling through the displays.
6. Once the configuration for the Fan is complete, press
the NEXT key until the LCD displays the "Start test in
__Sec. " screen. Press the + key to designate the delay
before the test is to start.This service test will begin
after theTEST START key is pressed and the delay
designated in this step has elapsed. Press the ENTER
key to confirm this choice.
7. Press theTEST START key to start the test. Remember
that the delay designated in step 6 must elapse before
the fans will begin to operate.
RT-SVX36K-EN
WARNING
Live Electrical Components!
During installation, testing, servicing and
troubleshooting of this product, it may be necessary to
work with live electrical components. Have a qualified
licensed electrician or other individual who has been
properly trained in handling live electrical components
perform these tasks. Failure to follow all electrical
safety precautions when exposed to live electrical
components could result in death or serious injury.
8. With the system in the SERVICE MODE and the supply
fan rotating in the proper direction, measure the
Unit Start Up
103

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents