Export And Import Of Archiver Configuration; Archiver Runtime Tasks - IBM E02HRLL-G - WebSphere Partner Gateway Express Administration Manual

Administration guide
Table of Contents

Advertisement

1. Click Hub Admin > Hub Configuration > Archiver > Archiver Configuration.
2. Click Edit icon to modify the required parameters. Refer to section Table 37 on
3. Save the archiver configuration. The status will change to Currently being
4. An event is published to trigger the scheduler component. The scheduler reads
5. The status then changes to Scheduled from Currently being scheduled.
What to do next
You can also reset a failed archiver task by selecting Resume scheduling.

Export and Import of archiver configuration

About this task
For detailed procedure on exporting and/or importing archiver configuration, refer
to the chapter Chapter 6, "Administering partner migration," on page 61

Archiver runtime tasks

During runtime, the archiving activity is done as described below:
1. The archiver task is invoked by the system.
2. The configuration is read and the appropriate data is archived to the backup
3. The common file system is cleaned up and data is purged from the database
Here is the archiver runtime flow:
1. The Scheduled Archiver task runs as per the configured schedule.
2. The Archiver marks itself as Running in the database. The same status is
3. The archiver reads the stored configuration from the database. The
4. If the 'Copy' attribute is selected in the archiver configuration, then:
5. The archiver cleans-up the files from the Common File System. All files older
132
IBM WebSphere Partner Gateway Enterprise and Advanced Editions: Administration Guide
The Archiver Task is displayed in the view mode.
page 130 for details on the parameters.
scheduled.
the task configuration and updates the WebSphere Application Server
configuration. The database tables are updated with the configuration
information, which will be used during execution of archiver task and
reporting.
locations.
tables.
displayed (at that instance) on the console.
configuration will be stored in the database during the state transition from
'Currently being scheduled' to 'Scheduled'.
a. The archiver takes the backup of the non-repudiation store from the
database. The rows from LG_MSG_ARCHIVE table are exported to files in
the directory specified in the database archive destination. It also exports
the rows from the LG_CERT_ARCHIVE table.
b. The archiver copies the contents of the non-repudiation folder to the backup
location.
Note: The criteria to backup the data is based on the configuration of the
archiver task.
than the cutoff date specified are deleted.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Websphere partner gateway

Table of Contents