HP NetServer AA 6200 Administrator's Manual page 36

Hp netserver aa solution administrator's guide v4.0 sp1
Hide thumbs Also See for NetServer AA 6200:
Table of Contents

Advertisement

After the IOPs complete their boot process, the CEs boot: one CE loads the Windows operating
system; then the other CE is synchronized so that both CEs perform all CPU and memory
functions in a synchronized manner. This ensures that in the event of a CPU or memory failure,
the Endurance server's operating system provides continuous computing without any loss of
context. After the CE boot process completes, the Endurance server is available for use. For an
IOP to service the CE boot request, it must have completed boot, as shown in
Figure 2-3
and
described in
Appendix
B.
The CE boot process is summarized in
Figure
2-4. A detailed CE boot process flow chart is in
Appendix
B.
2-8
HP Netserver AA Solution Administrator's Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netserver aa solution

Table of Contents