Overview Of The Installation Steps - Fujitsu PRIMERGY RX600 S6 Operating Manual

Fujitsu server user manual
Hide thumbs Also See for PRIMERGY RX600 S6:
Table of Contents

Advertisement

2

Overview of the installation steps

This chapter contains an overview of the steps necessary to install your server.
Links guide you to sections where you can find more detailed information on the
individual steps:
Ê At first, please take notice of the safety instructions in chapter
information" on page 27
Ê Transport the server to the place where you want to install it.
Ê Unpack all parts, check the contents of the package for visible transport
damage and check whether the items delivered match the details on the
delivery note (see section
Ê Make sure that all necessary manuals (see
page
12) are available; print out the PDF files if required.
Ê Fit the server in the rack (see section
on page
43).
Ê Wire the server. Follow the instructions in the sections
to the server" on page 47
on page
55.
Ê Connect the server to the mains (see section
mains" on page
Ê Familiarize yourself with the controls and indicators on the front and rear of
the server (see section
Ê Configure the server and install the desired operating system and
applications. Here you can choose from two possibilities:
– Remote installation with the ServerView Installation Manager:
With the ServerView Suite DVD 1 provided, you can configure the server
and install the operating system in a convenient manner.
Details on how to operate the ServerView Installation Manager, as well
as some additional information, are included in the "ServerView Suite
Installation Manager" user's guide (on ServerView Suite DVD 2 under
Industry Standard Servers - Software - ServerView Suite - Server Installation
and Deployment).
RX600 S6
and following.
"Unpacking the server" on page
and
"Notes on connecting/disconnecting cables"
49).
"Control elements and indicators" on page
Operating Manual
"Documentation overview" on
"Rack installation/removal of server"
"Connecting devices
"Connecting the server to the
"Important
42).
57).
25

Advertisement

Table of Contents
loading

Table of Contents