Scheduling - Planet XRT-811 User Manual

Internet broadband router
Table of Contents

Advertisement

XRT-811 User's Manual

Scheduling

This schedule can be (optionally) applied to any Access Control Group.
Blocking will be performed during the scheduled time (between the "Start" and "Finish"
times.)
Two (2) separate sessions or periods can be defined.
Times must be entered using a 24 hr clock.
If the time for a particular day is blank, no action will be performed.
Define Schedule Screen
This screen is accessed by the Scheduling link on the Security menu.
Data - Define Schedule Screen
Day
Session 1
Session 2
Start Time
Finish Time
Figure 45: Define Schedule Screen
Each day of the week can be scheduled independently.
Two (2) separate sessions or periods can be defined. Session 2 can be
left blank if not required.
Enter the start using a 24 hr clock.
Enter the finish time using a 24 hr clock.
70

Advertisement

Table of Contents
loading

Table of Contents