Preparing for Installation
Unpacking
Tools Required
General:
–
–
–
–
–
–
–
–
Programming:
–
Additional Parts Required
The following items are required in addition to those supplied by Avaya.
Compact DECT Base Station:
–
–
Compact DECT Repeater:
–
Compact DECT - Installation Manual
38DHB0002UKFH – Issue 5 (27th October 2003)
1. Do not start unpacking until the equipment is at the site of installation.
2. Before unpacking check for any signs of damage that has occurred
during transit. If any damage exists bring it to the attention of the
carrier.
3. Check all cartons against the packing slip. Report any errors or
omissions to the dealer who supplied the equipment.
4. Whilst unpacking the equipment, retain all the packaging material.
Fault returns are only accepted if repackaged in the original packaging.
5. Visually inspect each item and check that all the necessary
documentation and accessory items have been included. Report any
errors or omissions to the dealer who supplied the equipment.
6. Ensure you read and understand any documentation included with any
item.
0.5mm flat blade screwdriver.
No.1 Phillips Crosspoint.
Cutter/knife for cable ties.
Cable ties - 3mm x 50mm.
Drill and masonry drill bits
Tape measure (up to 500mm).
Spirit level.
Digital voltmeter (DVM).
Windows 3.x/95/2000 or NT PC with serial port supporting 19.2K baud
minimum.
Single-twisted pair cable (Type CW1308) from Coms. Platform/MDF to
CDBS.
1 x DCU Programming/Integration cable as required (see page 44)
No additional parts are required.
Preparing for Installation - Page 11
Unpacking
Page 11