Installation; Unpacking The Control Unit; Mounting The Control Unit - Teledyne 6000B Operating Instructions Manual

Photometric analyzer
Table of Contents

Advertisement

Photometric Analyzer
Installation of Model 6000B Analyzers includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
This chapter covers installation of the Control Unit. (Installation of the
Analysis Unit is covered in Part II of this manual.)
2.1
The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the Control Unit and
inspect it for damage. Immediately report any damage to the shipping agent.
2.2
The Model 6000B Control Unit is for indoor/outdoor use in a general
purpose area. This Unit is NOT for any type of hazardous environ-
ments.
Figure 2-1 is an illustration of a Model 6000B standard Control Unit
front panel and mounting brackets as shown two mounting tabs are at the top
and two at the bottom of the units frame.

Installation

the Analysis Unit

Unpacking the Control Unit

Mounting the Control Unit

Teledyne Analytical Instruments
Part I: Control Unit
Part I: 2-1

Advertisement

Table of Contents
loading

Table of Contents