Installing The Operation Panel; Connecting The Cord - JUKI IP-110 Type F Instruction Manual

Hide thumbs Also See for IP-110 Type F:
Table of Contents

Advertisement

warNING :
this Instruction Manual describes the operation panel IP-110F.
Be sure to use this operation panel after having read to fully understand the "Safety precautions" in
the Instruction Manual for the Sc-920 (control box).
In addition, be careful not to splash water or oil on it, or shock such as dropping and the like since
this product is a precision instrument.

1. INStaLLING tHE oPEratIoN PaNEL

warNING :
to prevent personal injury caused by abrupt start of the sewing machine, carry out the work after
turning oFF the power switch and ascertaining that the motor has completely stopped.
1
) Remove sde plate setscrews 1 from the sde plate.
2) ��stall operato� pa�el
��stall operato� pa�el 2 o� the mach�e head us�g screws 5 , pla� washer 3 , toothed washer 6 a�d
rubber seat 4 suppled wth the pa�el.
1. DDL-9000B (Not provided with aK) is given as an example of installing procedure.
2. Screw to install the panel changes according to the machine head used. refer to table 1 and con-
firm the kind of screw.
< the relation between the respective machine heads and the positions of installing hole of the bracket are as described in the table. >
1
2 3 4

2. coNNEctING tHE corD

A
table 1
DDL-9000A
DDL-9000B
DLN-900
LH-3500A
5 6
1
-  -
2
4
6
3
��stall�g hole
1 - 5
M5 X 2
1 - 5
M5 X 6
2 - 5
3/6-28 L=4
2 - 5
M5 X 4
) Route cord 1 of the operato� pa�el through
hole A � the table toward the u�dersde of the
table.
2) Refer to the ��structo� Ma�ual for the SC-920
for how to co��ect the co��ector.
5
Screw
Screw suppled wth pa�el
as accessores
Screw suppled wth pa�el
as accessores
Screw suppled wth pa�el
as accessores
Sde plate setscrew

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc-920

Table of Contents