Serial Communication Operation; Positioning Operation In Accordance With Programs; Multidrop System - Mitsubishi Electric Melservo-J2-SUPER series Instruction Manual

General-purpose ac servo
Hide thumbs Also See for Melservo-J2-SUPER series:
Table of Contents

Advertisement

4. OPERATION

4.6 Serial communication operation

The RS-422 or RS-232C communication function may be used to operate the servo amplifier from a
command device (controller) such as a personal computer. Note that the RS-422 and RS-232C
communication functions cannot be used at the same time.
This section provides a data transfer procedure. Refer to Chapter 15 for full information on the connection
and transferred data between the controller and servo amplifier.

4.6.1 Positioning operation in accordance with programs

By selecting the program No. and switching on the forward rotation start (ST1) using the communication
function, positioning operation in accordance with programs can be started.
(1) Selection of programs
Using the device forced output from the controller (command [9][2], data No. [6][0]), choose programs
from among No.1 to 16.
(2) Timing chart
Transmission
1)
data
Servo motor
speed
No.
1)
Program No.2 selection
2)
Program No.1 selection
3)
Program No.3 selection
4)
Forward rotation start (ST1) ON
5)
Forward rotation start (ST1) OFF

4.6.2 Multidrop system

The RS-422 communication function can be used to operate several servo amplifiers on the same bus. In
this case, set the station numbers to the servo amplifiers to determine the destination servo amplifier of
the currently transmitted data. Use parameter No.15 to set the station numbers.
Always set one station number to one servo amplifier. Normal communication cannot be made if one
station number is set to two or more servo amplifiers. When using one command to operate several servo
amplifiers, use the group designation function described in Section 4.6.3.
Controller
5ms or more
4)
5)
2)
3ms
Program No. 2
Transmission data
MITSUBISHI
MITSUBISHI
To CN3
CHARGE
Axis 1
Axis 2
(Station 0)
(Station 1)
For cable connection diagram,
refer to Section 8.1.1.
5ms or more
4)
5)
Program No. 1
Command
[9] [2]
[9] [2]
[9] [2]
[9] [2]
[9] [2]
MITSUBISHI
To CN3
To CN3
CHARGE
CHARGE
Axis 3
(Station 2)
RS-422
4 - 46
5ms or more
3)
4)
5)
Program No. 3
Data No.
[6] [0]
[6] [0]
[6] [0]
[6] [0]
[6] [0]
MITSUBISHI
CHARGE
Axis 32
(Station 31)
To CN3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents