Completing The Installation; Replacing The Bezel; Installing The Side Cover - IBM 8647 - Eserver xSeries 225 Maintenance And Troubleshooting Manual

Hardware maintenance manual
Hide thumbs Also See for 8647 - Eserver xSeries 225:
Table of Contents

Advertisement

Completing the installation

To complete installation of an option, you must reinstall front bezel, reinstall the side
cover, reconnect all the cables that you disconnected earlier and, for certain
options, run the Configuration/Setup Utility program. Follow the instructions in this
section.
Attention:
after turning on the server. Operating the server for extended periods of time (over
30 minutes) with the server cover removed might damage server components.
Note: If you have just plugged the power cords of your server into electrical outlets,

Replacing the bezel

Complete the following steps to replace the front bezel:
1. Insert the two tabs on the bottom of the front bezel into the matching holes on
2. Push the top of the front bezel toward the server until the two tabs at the top of
3. For hot-swap hard disk drive models, make sure the side cover is unlocked;

Installing the side cover

If you removed the frame-support bracket or front bezel, reinstall them before you
replace the side cover. See "Removing the frame-support bracket" on page 43 and
"Replacing the bezel"
For proper cooling and airflow, replace the side cover before or shortly
you will have to wait approximately 20 seconds before pressing the
power-control button.
the server chassis.
the front bezel snap into place.
then, insert the hot-swap lock bar into the slots on the bezel and rotate it to the
locked position. The hot-swap lock bar locks when you lock the side cover key
lock.
Chapter 4. Installing options
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xseries 225 type 8647

Table of Contents