Deployment and Commissioning Process
Figure 4-6
Click the Commission button from the Configuration tab
process, which allows the C65/76M to determine which modules are installed on the switch or the router
and also allows CEMF to start monitoring the switch or the router.
Note
Commissioning may take a few minutes.
After the Network Element object is commissioned, the Physical view will resemble
Figure 4-7
Cisco 6500/7600 Series Manager User Guide
4-10
SNMP Tab in the Network Element Dialog Box
Fully IP-Discovered and Commissioned Catalyst 6513 Switch
Chapter 4
Deploying the C65/76M
(Figure
4-5) to start the subchassis discovery
Figure
4-7.