Other Carrier Equipment

You are responsible for ordering/supplying the
following equipment:
COMSPHERE 72-inch high cabinet, or other EIA
standard 19- or 23-inch wide cabinet
Fan module(s), if needed
Shared Diagnostic Control Panel (SDCP)
Shared Diagnostic Unit (SDU), if needed
DTE interface assembly, if needed
Alarm buzzer or light
One or two Network Interface Modules (NIMs), if
needed
Connector modules
Speaker panel, if needed
One network interface cable for each of the DSUs
or modems
TDM, MCMP, and /or digital bridge interface
cables, if needed
Connecting cables and cords
Rear connector plates for optional pre-mounting;
modular devices are packaged with rear connector
plates. You can also order rear connector plates
separately
Filler panels for empty slots
T1 auxiliary backplane(s), if needed
Devices, including DSUs and CSUs
Applicable manuals.
documents list and equipment list.

Preinstallation Inspection

When your equipment arrives, perform an inspection:
Carrier. Remove the carrier from its shipping
container and check for physical damage (refer to
Chapter
2).
Fan module. Check for physical damage, such as
broken blades. Spin fan blades manually to test for
damage.
3000-A2-GA31-D0
Appendix D
contains a related
Installing the Carrier and Assembly Components
Power transformer unit. Ensure that the unit has
not been damaged, possibly causing a short circuit
of internal components. Tighten any screws that
may have worked loose.
Shared Diagnostic Control Panel (SDCP).
Inspect the SDCP and its cable.
Shared Diagnostic Unit (SDU). Check the SDU
for physical damage. Ensure that the circuit card
and faceplate are not damaged.
Speaker panel. Check the speaker, speaker jack,
and panel for physical damage.
If any of your equipment shows signs of shipping
damage, report this immediately to your shipping and
service representatives.

Installation Considerations

Before installing your carrier, make sure:
Your installation site is well-ventilated, clean, and
free of environmental extremes.
You have 2 to 3 feet clearance at the front and rear
of the cabinet for installing the following:
— DTE cables
— Fan module
— Network interface connectors
— Rear connector plates or connector modules
— SDCP (optional)
You will need the following tools:
A large Phillips screwdriver to install a:
— Carrier in the cabinet
— Power transformer unit under the carrier
A small, flat-blade screwdriver for:
— Removing and replacing the cover plate or
SDCP
— Installing the 50-pin cable connectors
July 1999
3-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comsphere 3000 series

Table of Contents