Mounting Bracket Gate In The Open Position - Enterasys S Series Hardware Installation Manual

Stand alone switch
Table of Contents

Advertisement

Figure D-3

Mounting Bracket Gate in the Open Position

1
Gate in the open position
3.
Holding the SSA with the I/O connectors facing left, slide the bottom side of the SSA chassis
under the lip on the bottom side of the mounting bracket. See
Note: You must install the SSA chassis in the orientation shown in
facing left, top of SSA facing out). No other orientation of the SSA chassis is supported.
Enterasys S-Series Stand Alone (SSA) Hardware Installation Guide D-7
Mounting the SSA Chassis on a Wall
Figure
D-4.
Figure D-4
(I/O connectors

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssa-t8028-0652Ssa-g8018-0652

Table of Contents