Rack Mounting the Switch

To install the switch in a 19‐inch rack, you need: 
Two rackmount brackets and mounting screws (rackmount kit) shipped with the 
switch.
Four user‐supplied screws to attach the switch to a standard 19‐inch rack.

Guidelines for Rackmount Installation

The installation site must be within reach of the network cabling and meet the 
requirements listed below:
Appropriate grounded power receptacles must be located within 152 cm (5 ft) of the 
location.
A temperature of between 5°C (41°F) and 40°C (104°F) must be maintained at the 
installation site with fluctuations of less than 10°C (18°F) per hour.

Area Guidelines for Switch Installation on Flat Surface

À
Ã
Note: To ensure proper ventilation and prevent overheating, leave a minimum clearance
space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.
Rack Mounting the Switch
Â
3 44.5 cm (19.4 in.) for proper ventilation
4 419.0 cm (16.5 in.) for proper ventilation