4.4

Operating position

 The burner is designed to work only in posi-
tions 1 and 4 (Fig. 11).
 Installation 1 is preferable, as it is the only
WARNING
one that allows the maintenance operations
as described in this manual.
 The installation 4 permits the operation, but
makes the maintenance and inspection oper-
ations of the combustion head more difficult.
1
20130432
4.5

Removing the shutter lockout screws

Remove the screws 1)-2) and nuts before fitting the burner onto
the boiler (Fig. 12).
Replace them with the screws 3) M8x20 supplied as standard.
4.6

Preparing the boiler

4.6.1

Boring the boiler plate

Pierce the closing plate of the combustion chamber, as in Fig. 13.
The position of the threaded holes can be marked using the ther-
mal insulation screen supplied with the burner.
4.6.2

Blast tube length

The length of the blast tube must be selected according to the in-
dications provided by the manufacturer of the boiler, and in any
case it must be greater than the thickness of the boiler door com-
plete with its fettling.
For boilers with front flue passes (Fig. 15), or with a flame inver-
sion chamber, use a protection made out of refractory material
that allows the blast tube to be removed.
For boilers with a water-cooled front a refractory lining is not nec-
essary unless expressly required by the boiler manufacturer.
Installation
2
3
15
 Any other position could compromise the cor-
rect operation of the appliance.
 Installation 5 is prohibited for safety reasons.
DANGER
4
1
2
2
20111252
1
GB
5
3
3
600 DB20
560 DB16
700
D3893
Fig. 11
Fig. 12
Fig. 13
20155221

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

20154863

Table of Contents