Graphic processor (GPU)
Concluding steps
▶
"Installing the HDD cage" on page
▶
"Reassembling" on page
▶ Connect all external cables.
▶
"Connecting the power cord" on page
12.4
Replacing a single GPU (air cooling)
Field Replaceable Unit
(FRU)
Tools:
– Phillips PH2 / (+) No. 2 screwdriver
– T20 Torx screwdriver (for GPU heat sink)
Preliminary steps
▶
"Locating the defective component" on page
▶
"Shutting down the server" on page
▶
"Disconnecting the power cord" on page
▶ Disconnect all external cables.
▶
"Getting access to the component" on page
▶
"Extending the server out of the rack" on page
▶
"Removing the server from the rack" on page
▶
"Removing top covers" on page
▶
"Removing the HDD cage" on page
Removing the defective GPU
▶ Remove the GPU board carrier, see
page
194.
216
86.
49.
56.
38.
45.
85.
"Removing the GPU board carrier" on
Upgrade and Maintenance Manual
Hardware: 30 minutes
37.
38.
39.
39.
41.
GX2560 M7