Download Print this page

Bard CritiCore 000002 Service Manual page 27

Advertisement

Note:
Review the contents of the bezel enclosure replacement parts kit
(see Replacement Parts List on page 66), to confirm which parts
you may need to keep/discard during disassembly.
Procedure
1.
Ensure that the Monitor is turned off. Remove the battery doors and
battery packs.
2.
Place the Monitor face down on a soft surface.
3.
Remove the hinge pins which connect the display assembly to the
Monitor enclosure.
Each hinge pin has an e-style snap ring mounted on
it. The snap ring must be removed in order to pull out the hinge pin. The
snap ring must be oriented properly, as illustrated in Figure 7 in order to
remove it. İf the snap ring is not properly oriented, rotate it into correct
position by using a small flathead screwdriver.
Using a needle-nose pliers, remove both snap rings.
After removing both snap rings, pull out both hinge pins as illustrated in
Figure 8.
>
6.
Open the rear control pane! door.
Ensure that both the SET VALUE and
Figure 8
the TEST SWITCH rotary knobs are set to NORMAL OPERATION, then
puit gently to remove the rotary knobs.
7.
Remove the four (4) 6-32x3/8" Phillips pan-head screws as illustrated in
Figures 9 and 10 (arrows indicate screw locations). Close the rear panel
door.
8.
Pull straight up on the rear enclosure (see Figure 11) to separate it from
the front of the Monitor. The arrow in Figure 11. illustrates how to hold
the blank insert in place while removing the rear enclosure.
Remove and
set aside the blank plastic insert.
°
'Figure 9
9.
Pull out on the ejector latches on the display cable connector (see Figure
12),
Disconnect the display cable from the main PCB.
At this point the
display assembly is totally detached from the Monitor.
10. Place the display assembly on a soft surface.so that the membrane
switch is face down.
Fi
0
11. Separate the bezel enclosure from the bezel top assembly by removing
igure
the four (4) 6-32x1/4" Phillips pan-head screws.
Installing the Bezel
Equipment Required
Enclosure
e
No. 2 Phillips screwdriver
+
Needle nose pliers
static sensitive electronic devices.
Do not attempt to repair any
internal components without proper ESD (Electro-Static
Discharge) handling equipment.
Failure to properly ground both
your body and your work station could result in damage to the
Monitor.
7
Caution:
The Bard CritiCore Monitor main and display PCB's contain
Bard CritiCore Monitor Service Manual
Page 21

Advertisement

loading

Related Products for Bard CritiCore 000002