Temperature Checkout - IBM x 340 Series Hardware Maintenance Manual

Table of Contents

Advertisement

Temperature checkout

28
Hardware Maintenance Manual: xSeries 340 Model 6RY
b. As you slide it under the battery clip, press the battery down into the socket.
5.
Reinstall the server cover and connect the cables.
Note: Wait approximately 20 seconds after you plug the power cord of your
server into an electrical outlet for the Power Control button to become
active.
6.
Turn the server on.
7.
Start the Configuration/Setup Utility program and set configuration parameters.
Set the system date and time.
Set the power-on password.
Reconfigure your server.
Proper cooling of the system is important for proper operation and system reliability.
For a typical xSeries 340 server, you should make sure:
Each of the drive bays has either a drive or a filler panel installed
Each of the power supply bays has either a power supply or a filler panel installed
The top cover is in place during normal operation
There is at least 50 mm (2 inches) of ventilated space at the sides of the server and
100 mm (4 inches) at the rear of the server
The top cover is removed for no longer than 30 minutes while the server is
operating
The processor housing cover covering the processor and memory area is removed
for no longer that ten minutes while the server is operating
A removed hot-swap drive is replaced within two minutes of removal
Cables for optional adapters are routed according to the instructions provided
with the adapters (ensure that cables are not restricting air flow)
The fans are operating correctly and the air flow is good
A failed fan is replaced within 48 hours
In addition, ensure that the environmental specifications for the system are met. See
"Features and specifications" on page 3.
For more information on specific temperature error messages, see "Temperature error
messages" on page 126.

Advertisement

Table of Contents
loading

This manual is also suitable for:

6ry

Table of Contents