Installing The Cover - IBM IntelliStation R Pro Hardware Maintenance Manual

Table of Contents

Advertisement

Installing the cover

The following information describes the cover installation procedure.
To install the server/workstation cover:
1.
Clear any cables that might impede the replacement of the clear shield or the
cover.
2.
Install the clear shield, if it was removed.
Note: Thermal considerations require that the clear shield be installed before
operating the server/workstation.
3.
Install the cover by placing it into position and sliding it forward. Make sure the
cover engages the tabs at the front and rear of the server/workstation.
Attention: Before sliding the cover forward make sure that all of the tabs on the
cover will engage the ledge at the front of the server/workstation properly. If all
of the tabs do not engage the ledge properly, it will be extremely difficult to
remove the cover.
4.
Install the screws and secure the cover as shown.
5.
Reinstall the server/workstation in the rack (see "Rack installation" on page 47).
6.
Reconnect the power cord and all external cables to the server/workstation, then
plug the power cords into electrical outlets.
Screws
Installing options
93

Advertisement

Table of Contents
loading

This manual is also suitable for:

330 xseries86746851

Table of Contents