NETGEAR M4350 Series Hardware Installation Manual page 4

Fully managed switches
Hide thumbs Also See for M4350 Series:
Table of Contents

Advertisement

Fully Managed Switches M4350 Series
ports.................................................................................................37
Dual-function Reset button...........................................................38
USB 3.0 ports..................................................................................39
Out-of-band 1G Ethernet port.....................................................39
USB Type-C console port..............................................................39
PoE port capacities and budgets.....................................................40
Auxiliary power supplies....................................................................42
Fans......................................................................................................44
Speed and cables...............................................................................46
Step 1: Prepare the site......................................................................48
Step 2: Protect against electrostatic discharge..............................49
Step 3: Unpack the switch.................................................................49
Unpack a full-width model............................................................49
Unpack a half-width model...........................................................51
Step 4: Mount or place the switch....................................................54
Install a full-width model in a rack................................................54
Install a single half-width switch in a rack...................................55
Install two half-width switches in a rack.......................................57
Detach two connected half-width switches................................60
Place the switch on a flat surface.................................................62
Step 7: Connect devices to the switch.............................................64
Step 8: Check the installation...........................................................64
Step 9: Apply AC power and check the LEDs.................................65
Troubleshooting chart.......................................................................68
PoE troubleshooting suggestions....................................................69
Additional troubleshooting suggestions.........................................70
4

Advertisement

Table of Contents
loading

Table of Contents