Daikin R32 Sky-Air RZAG-M Service Manual page 93

Table of Contents

Advertisement

ESIE17-08
|
Part 3. Repair
9
2
9
10
9
13
14
1. Terminal block
2. Connectors
3. Screw
4. Main PCB 1-phase
5. Lid
6. Screw
7. 7-segment display
Secondly, strip the Main PCB assembly (front)
14. Cut the tie wraps that fix the protection sheet; remove the protection sheet (not visible).
15. Cut the tie wrap (9).
15/11/18
|
Version 1.1
R32 Sky-Air RZAG-M
Figure 3-26: Removing the main PCB assembly (1-phase)
2
7
1
12
14
11
3.3. Unit specific repair procedures
9
2
3
4
5
6
5
6
8
3
8. Ground wire
9. Tie wrap
10. Screw
11. Screw
12. Screw
13. Plug
14. Screw
Page 93

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzqg71Rzqg100Rzqg125Rzqg140

Table of Contents