Replacing High Pressure Switch - Daikin R32 Sky-Air RZAG-M Service Manual

Table of Contents

Advertisement

ESIE17-08
|
Part 3. Repair

3.3.2.13. Replacing high pressure switch

PRELIMINARY ACTIONS
1.
Switch off the Daikin unit via the user interface.
2.
Switch off the Daikin unit with the field supplied circuit breaker.
3.
Remove plate work when required (refer to
4.
Recover the refrigerant (refer to
5.
Connect a nitrogen hose to the outdoor suction service port.
6.
Attach a hose with core-depressor to allow the release of the nitrogen.
PROCEDURE
Removal
1.
Unplug the high pressure switch connector.
2.
Cut the tie wrap.
3.
Cut the high pressure switch S1PH pipe.
4.
Remove the high pressure switch (1).
C
AUTION
The maximum applied Nitrogen pressure must not exceed 0.02 MPa.
5.
Supply nitrogen to the piping circuit.
6.
Heat the pressure switch pipe using an oxygen acetylene torch.
7.
When the solder is liquid, pull the pressure sensor pipe.
8.
Cut the nitrogen supply when the piping has cooled down.
1. High pressure switch
2. Low pressure switch
15/11/18
|
Version 1.1
R32 Sky-Air RZAG-M
"Basic removal" on page
"Refrigerant repair procedures" on page
Figure 3-23: Removing high pressure switch
1
3
2
3.3. Unit specific repair procedures
67).
61).
3. Compressor discharge thermistor
Page 89

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzqg71Rzqg100Rzqg125Rzqg140

Table of Contents