Keypad: Names And Functions - YASKAWA T103 Installation & Primary Operation

Ac drive for industrial applications
Table of Contents

Advertisement

2.
Wire the closed-loop crimp terminal to the main circuit terminal block.
3.
Tighten the nut to the specified torque.
4.
Put the terminal cover back in its initial position.
8

Keypad: Names and Functions

YASKAWA TOEPC71061782C GA800 Drive Installation & Primary Operation
Figure 7.9 Install the Electrical Wire
Figure 7.10 Tighten the Terminal Block Nut
Figure 8.1 Keypad
8 Keypad: Names and Functions
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ga800T140T168T208T250T302 ... Show all

Table of Contents