6
Channel Exchange and Installation
Replacement Procedure for Micro GC Channel
Replacement Procedure for Micro GC Channel
Tools required
The following tools are required to perform the replacement procedure described in this section.
Allow approximately 5 to 10 minutes to complete this process. Refer to p/n 19199H for the
installation tool kit.
•
3/16 inch open-end wrench
•
Torx T-10
•
Torx T-20
Channel removal procedure
1 Remove power cord.
2 Remove sample-in and carrier gas connections.
3 Remove the main rear cover by removing the two Torx T-10 screws.
86
Torx T-10 screw
Main rear cover
Torx T-10 screw
Agilent 990 Micro GC User Manual