3
Installation and Use
Pre-Installation Requirements
Pre-Installation Requirements
Prepare the installation site as described in the Site Preparation Guide (G3581-90002), including
the recommended Gas Clean filters.
Inspect the Shipping Packages
The Micro GC will arrive in one large box and one or more smaller cartons. Inspect the cartons
carefully for damage or signs of rough handling. Report damage to the carrier and to your local
Agilent office.
Unpack the Micro GC
Unpack the Micro GC and accessories carefully, and transfer them to the work area using proper
handling techniques. Inspect the instrument and accessories carefully for damage or signs of
rough handling. Report damage to the carrier and to your local Agilent office.
Avoid back strain or injury by following all safety precautions when lifting heavy objects.
WAR N IN G
34
Agilent 990 Micro GC User Manual