Laboratory Setup Requirements - Agilent Technologies Bravo Safety And Installation Manual

Automated liquid-handling platform
Table of Contents

Advertisement

Laboratory setup requirements

About this topic
Space and bench requirements
Bravo Automated Liquid-Handling Platform User Guide
This topic describes the lab requirements for the Bravo Platform. Read this
topic before you unpack and install the Bravo Platform.
Place the Bravo Platform in a location that has the following:
Proximity to power outlet
Enough space to accommodate the Bravo Platform, computer, monitor,
pendant, and accessories
A fixed bench (without wheels) that can support the weight of the Bravo
Platform without excessive shaking or movement
Access so that you can quickly disconnect the power to the Bravo Platform
if the need arises
If the Bravo Platform is outside an enclosure, you can install a rear shield to
prevent rear access to the device's moving parts while still allowing easy
access to the rear power connections.
The Bravo Platform has the following physical specifications:
Dimension
Standard Bravo Platform
Height
69.7 cm (27.4 in)
Width
64.8 cm (25.5 in)
Depth
43.8 cm (17.2 in)
Weight
52.1 kg (114.9 lb)
Figure Dimensions of a standard Bravo Platform
64.8 cm
00232
Bravo
Pinch Hazard
69.7 cm
43.8 cm
2 Installing the Bravo Platform
Laboratory setup requirements
SRT Bravo Platform
61.7 cm (24.3 in)
64.8 cm (25.5 in)
43.8 cm (17.2 in)
51.5 kg (113.5 lb)
19

Advertisement

Table of Contents
loading

Table of Contents