Adding An Aem Between Two Other Modules - Northern Telecom Meridian Meridian 1 Installation Manual

Application equipment module
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Adding an AEM between two other modules

Procedure 11xxx
Adding an AEM between two other modules
1
Remove the rear grill on the pedestal and set all circuit breakers to OFF
(down).
2
Remove the module that will be above the AEM:
a.
Remove all the covers on the rear of the modules that will be
above and below the AEM.
b.
Disconnect the power connectors between the modules (see
Figure 21).
c.
Disconnect the system monitor cable from connector J1 in the
module that will be above the AEM (see Figure 21).
d.
Use a 9/16" socket wrench to remove the five mounting bolts that
secure the module above (see Figure 22) and lift it off the column.
3
Position and secure modules:
a.
Locate the positioning guides on what is now the top module in the
column (see Figure 23). Make sure the AEM is facing the same
direction as the column.
b.
Place the AEM on top of the column and adjust it until it is seated
securely on the positioning guides.
c.
Secure the mounting bolts on the module.
d.
Place the removed module on top of the AEM and secure it with
the mounting bolts.
4
Connect the power and system monitor cables between modules:
a.
Remove all the covers on the rear of the AEM.
b.
Connect the power connectors between the AEM and the modules
above and below it.
c.
Connect the system monitor cable from connector J2 in the module
below to J1 in the AEM.
d.
Connect the system monitor cable from J2 in the AEM to J1 in the
module above.
5
See the Application Module installation and upgrade guide
(553-3201-210) for instructions on installing the Application Module
and powering up the column.
Adding an AEM to a column 47
Application Equipment Module Installation guide