Figure 11 Pedestal To Nt6D82 Connections - Northern Telecom Meridian Meridian 1 Installation Manual

Application equipment module
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Figure 11xxx
Pedestal to NT6D82 connections
NT6D82 power plant
distribution panel
0
1
2
1
0
Note 1
Cabling in conduit between pedestal and NT6D82
To CB0 (module 0)
and CB4 (blower)
Note 1: Either connecting bar or LVD contacts
Note 2: Do not connect trip lead if LVD option is installed.
To single point ground of system
Ground busbar/ LRE
Up to 16 breakers
Column # 1
Battery ( - ) connection
Shunt
To CB2
(module 2)
To CB3
To CB1
(module 3)
(module 1)
-
-
-
-
BAT0
BAT1
BAT2
BAT3
0
1
Installing a stand-alone AEM 19
Battery ( + ) connection
Column # 8
DCON 1,2,3-3 wires (grn, wh, red)
DCON 0-1 black wire
To system monitor via NT8D46AV cable
TB1 in pedestal
To connections in PDU
+
+
+
+
BRTN3 FGND
BRTN0
BRTN1
BRTN2
0
1
Application Equipment Module Installation guide
Terminal block TB2
21
OCA C
20
OCA NO
19
GND
18
LVD MJR
17
LVD MJ
16
LVD MNR
15
LVD MN
14
FA C
13
FA NO
12
MN C
11
MN NO
MJ C
10
9
MJ NO
8
LVA2 C
7
LVA2 NO
6
LVA1 C
5
LVA1 NO
4
HVA2 C
3
HVA2 NO
2
HVA1 C
1
HVA1 NO
Trip-1 brown wire (Note 2)
Alarm-1 orange wire
LRTN
Factory-installed
2
inside pedestal

Advertisement

Table of Contents
loading

Table of Contents