Figure 13 Pedestal To Qbl15 Connections - Northern Telecom Meridian Meridian 1 Installation Manual

Application equipment module
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Figure 13
Pedestal to QBL15 connections
Black
wires
Orange wire
Note: one 30A feed per two modules
GRD POS (+) positive bus
W1
DISCHARGE
TB1
1
2
1
2
3
4
0
1
Red wires
To CB0
(module 0)
To CB2
and CB5
(module 2)
(blower)
To CB3
To CB1
(module 1)
(module 3)
-
-
-
-
BAT0
BAT1
BAT2
BAT3
1
0
Application Equipment Module Installation guide
Installing a stand-alone AEM 21
Part of QBL15 distribution box
0
1
3
4
5
6
7
8
Cabling in conduit to pedestal
TB1 in pedestal
To connections in PDU
+
+
+
+
BRTN0
BRTN1
BRTN2
BRTN3 FGND LRTN
1
0
Connect to LRE
2
CHARGE
1
2
3
9
10
11
2
Factory-
installed

Advertisement

Table of Contents
loading

Table of Contents