Figure 12 Pedestal To Qbl12 Or Qca13 Connections - Northern Telecom Meridian Meridian 1 Installation Manual

Application equipment module
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

20 Installing a stand-alone AEM
Figure 12
Pedestal to QBL12 or QCA13 connections
To Logic Return Equalizer/Ground Window
0
1
2
553-3201-200 Standard 1.0 April 1993
1
0
1
2
3
13 14 15 16 17 18 19 20 21 22 23 24
F1 F2 F3 F4 F5 F6 F7 F8
F13 F14 F15 F16 F17 F18 F19F20 F21F22F23 F24
Cabling in conduit between pedestal and QBL12/QCA13
To CB0
(module 0)
and CB5
To CB2
(blower)
(module 2)
To CB1
To CB3
(module 1)
(module 3)
-
-
-
BAT0
BAT1
BAT2
BAT3
0
1
Power/battery distribution panel
4
5
6
7
8
9
10 11 12
-48 V Terminal Panel
F9 F10 F11 F12
Fuse Panel
To connections in
PDU
-
+
+
+
BRTN0
BRTN1
BRTN2
0
1
TB1 in Pedestal
+
BRTN3 FGND
LRTN
2
Factory-
installed

Advertisement