Procedures for installation of the
switch

Installation preparation

This procedure describes how to prepare to install a switch.
Procedure Steps
Step
1
2
3

Verifying environment suitability

This procedure describes how to verify environment suitability.
Procedure Steps
Step
1
2
Copyright © 2008–2009 Nortel Networks
WARNING
To avoid bodily injury from hazardous electrical shock and
current, never remove the top of the device. There are no
user-serviceable components inside.
Action
Determine the type of installation
Prepare the site.
Collect the tools required to install a switch.
Action
To verify environmental suitability for installation of the ERS 5500
Series switch, ensure that the area where you want to install
and operate the switch meets the requirements listed in
"Job aid: Ethernet Routing Switch 5500 Series environmental
requirements" (page
To verify environmental suitability for installation of the ERS 5600
Series switch, ensure that the area where you want to install
and operate the switch meets the requirements listed in

ERS 5000 Series Installation

NN47200-300 04.03
13 April 2009
--End--