Preparations For Network Connectivity; Ers 5000 Series Installation - Nortel BayStack 5520-48T-PWR Install Manual

Ers 5000 series ethernet routing switch
Hide thumbs Also See for BayStack 5520-48T-PWR:
Table of Contents

Advertisement

56 Installing the switch
Navigation
"Checking LEDs" (page 77)

Preparations for network connectivity

Use the following procedures to prepare for network connectivity.
Navigation
Assigning an IP address to the switch
Checking for software patches
Verifying software installation
Copyright © 2008–2009 Nortel Networks

ERS 5000 Series Installation

NN47200-300 04.03
13 April 2009

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents