94 Procedures for installation of the switch

Resetting a stack using the UI button

The following procedure describes the steps to reset the stack using the UI
button.
Procedure Steps
Step
1
2
3
Hybrid stack recommendations and limitation
Recommendations:
Limitation:
When stacking a 5632FD with any 5500 model, the last two 10gBE ports
(31 and 32) of all 5632s are disabled (you do not see port 31 and 32
on the show tech). This limitation only exists in Hybrid Stacks, and is
regardless of whether 5632s are adjacent to other 5632s or 5500s.
Copyright © 2008–2009 Nortel Networks
The Status LED returns to a steady green state to confirm
command acceptance. If the command is rejected, the Status
LED moves to a blinking amber state.
Action
Press and hold the UI button for three seconds.
The unit is now in configuration mode. The color and status of
the Status LED turns to blinking green.
Press the UI button three times.
The Base, Up, and Down LEDs will move to a blinking amber
state and blink in unison.
Press and hold the UI button for three seconds to confirm the
command.
The 5600 must be a base unit.
5600s must be adjacent.
For 5600 to 5600, use the new stack cables (blue
cables).
For 5600 to 5500, use either the new stack cables
(blue cables) or the old ones.

ERS 5000 Series Installation