64 Procedures for installation of the switch
Table 9
Job aid: Ethernet Routing Switch 5600 Series environmental requirements (cont'd.)
DVT temperature
Miscellaneous Operating Considerations
Verifying the contents of the box
This procedure describes how to verify the contents of the ERS 5500 box.
Procedure Steps
Step
1
Figure 7
Ethernet Routing Switch 5500 Series package contents
Copyright © 2008–2009 Nortel Networks
-15 to 65 C
•
•
•
•
•
•
Action
shows the components included with each switch in the 5500
Series. Compare package contents with those shown and listed
below to verify all components have been delivered. Should
any components be missing, contact the vendor from which the
switch was purchased.
ERS 5000 Series Installation
NN47200-300 04.03
13 April 2009
No heat sources such as hot air vents or
direct sunlight located near the switch.
No sources of severe electromagnetic
interference located near the switch.
No excessive dust in the environment.
An adequate power source is located within
6 feet (1.83 meters) of the switch. One
15-amp circuit is required for each power
supply.
At least 2 inches (5.08 centimeters) of
clearance on each side of the switch unit for
ventilation.
Adequate clearance is allotted at the front
and rear of the switch for access to cables.