90 Procedures for installation of the switch
3
4
5
Stack configurations
The following illustrations show Cascade up and Cascade down cable
arrangements, as well as the stack connectors for the 5500 and 5600
Series switches.
Figure 19
Job aid: 5500 Series stack connector
Figure 20
Job aid: 5600 Series stack connector
Copyright © 2008–2009 Nortel Networks
Select the base unit.
Connect the console cable.
Connect the AC power cord.
If you assign the base unit and non-base units with the switches
powered up, you must reset the switches for the assignments
to be applied.
ERS 5000 Series Installation
NN47200-300 04.03
13 April 2009
--End--