T4 Post Position Adjustment; Connector Location; Mech. I/F P.c. Board - Panasonic DVCPRO50 Service Manual

Hide thumbs Also See for DVCPRO50:
Table of Contents

Advertisement

(Adjustment)
1.
Place the reels in the L size position.
2.
Push the iron core of M-Stopper Solenoid by
hand.
3.
Observe the clearance (A) between Mech.
Chassis and M-Stopper as shown in Figure 5-27-2.
And make sure that it is within 1.1 to 1.3mm.
4.
If not, loosen the 2 screws (A), which fixed
M-Stopper Solenoid. And adjust the position of
M-Stopper Solenoid so that the clearance (A) is
within the specification. And tighten the 2 screws
(A).
Figure 5-27-2

6. CONNECTOR LOCATION

6-1.

Mech. I/F P.C. Board

P15
P11
P48

5-28. T4 Post Position Adjustment

1.
Confirm that the hole (B) of T4 connection Gear
match with the hole of T4 post as shown in figure
5-28-1.
2.
Confirm that the portion (C) of T4 connection Gear
and hole (A). Those are located as shown in figure
5-28-1.
3.
If not, adjust the phase of T4 post.
Note:
This
confirmation
unloading condition.
P16
P12
P25
P26
P21
P36
Figure 6-1-1
MECH-60
should
be
performed
Figure 5-28-1
on

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj-sd930pAj-sd955apAj-ya931gAj-ya932gAj-yac930g

Table of Contents