Figure 47. DIMM installation
Step 1.
Make sure the retaining clips are in the fully-open position; then, align the keys on the DIMM with
the connector.
Step 2.
Firmly press both ends of the DIMM straight down into the connector until the retaining clips snap
into the locked position.
Step 3.
If you are installing additional DIMMs, do so now.
After you install the DIMM, complete the following steps:
1. Reinstall the air baffle if it is removed (see "Install the air baffle" on page 53).
2. Install the node if needed (see "Install a compute node" on page 58).
3. Reconnect power cords and all external cables.
Dust filter replacement
Use this procedure to remove or install the dust filter.
Remove the dust filter in locking bezel
Use this information to remove the dust filter in locking bezel.
Before you remove the dust filter in locking bezel, complete the following steps:
1. Read the following sections to ensure that you work safely.
• "Safety" on page iii
• Chapter 4 "Hardware removal, installation and management guidelines" on page 27
2. Turn off the server. Disconnect the power cords and all external cables (see "Turn off the server" on
page 32).
3. Remove the node from the enclosure if needed (see "Remove a compute node" on page 55).
4. It is required to have dust filter when server is in operation.
To remove the dust filter in locking bezel, complete the following steps:
Watch the procedure. A video of the process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-A25P7vBoGa_wn7D7XTgDS_
• Youku:
http://list.youku.com/albumlist/show/id_50483444
ThinkAgile MX Certified Node Small FactorThinkAgile MX1021User Guide
64