User's Manual
Start-Up
Procedure
[1] Turn on the water supply to the Processor.
[2] Check that the Processor Cover is closed.
Note
The Replenisher Pumps start automatically when the Processor is turned on.
[3] Turn on the power for the Processor by moving the main wall circuit breaker to the
ON position.
[4] Turn on the Processor by moving the Main Power Switch on the Processor to the
"|" position. Allow 20 minutes for the Processor to warm up.
14–2
5B9615