Burner Mounting Plate / Burner Adapter Plate; Steam Trim - Burnham V11H Series Installation, Operating And Service Instructions

Commercial cast iron boiler
Table of Contents

Advertisement

Plate applied by manufacturer. If loose or peeling,
apply pressure to reset adhesive.
12. Place the rating label (from Instruction envelope)
over the top of front panel label that identifies the
proper location.
13. On steam boilers, attach lowest permissible water
level plate (from steam trim carton) to the front
panel using sheet metal screws.
14. Tighten all sheet metal screws to complete jacket
assembly.
MOUNT BURNER MOUNTING PLATE, refer to
G.
Figures 15 and 26.
1. Install ten (10) 5/16" x 2" long tap-end studs with
the short length of threads into the boiler front
section.
2. With the use of silastic, secure the 3/16" diameter
rope gasket to the groove along the mounting plate
opening in the front section.
3. Place burner mounting plate over studs and secure
with 5/16" flat washer, lock washers and brass nuts.
H.
MOUNT BURNER ADAPTER PLATE TO
BURNER MOUNTING PLATE, refer to Figures 26
and 27.
ALSO, REFER TO BURNER INSTALLATION
MANUAL FOR INSTRUCTIONS SPECIFIC TO
EACH BURNER.
1. In most cases the burner adapter plate carton for
the specified burner will be provided by Burnham
Commercial. Power Flame V1122H and V1123H
burners require special adapters that will be
provided with the burner.
2. If adapter is provided by Burnham Commercial,
open carton and remove contents. Apply four (4)
small dabs of silastic on rear surface of adapter plate
to temporarily hold gasket in place. Hold adapter
plate in position against burner mounting plate, align
holes and secure with four (4) 3/8" lock washers and
3/8" - 16 x 7/8" lg. cap screws.
3. If adapter is furnished with burner, follow
manufacturer's instructions using gasket material
and hardware provided with burner.
a. Power Flame burners for the V1122H and
V1123H are furnished with special adapter
plates.
b. All other burners connect directly to the adapter
plate supplied by Burnham Commercial.
4. USE A HOLE SAW OR KNIFE TO CUT
BURNER MOUNTING PLATE INSULATION TO
MATCH HOLE SIZE ON BURNER ADAPTER
PLATE. After cutting, remove any and all loose
pieces of insulation which may become lodged or
interfere with the head of a burner air tube after
insertion.
32
5. Confirm that hole in insulation fits snugly around
burner blast tube. If hole is oversized, remove
burner mounting plate (with burner attached)
from boiler. Use additional fiberglass rope gasket
provided with burner to fill in any space between
insulation and blast tube. If additional rope gasket
is not provided with the burner, use 3/8" fiberglass
rope rated for 2300°F (provided by others).
Reinstall burner mounting plate when finished.
Failure to properly fill all gaps between the
insulation and burner blast tube may result in
damage to the burner.
Le fait de ne pas remplir correctement tous les
espaces entre l'isolation et le tube de soufflage
du brûleur peut endommager le brûleur.
6. For boilers without tankless heaters, proceed to
Paragraph I (Install Steam Trim) or J (Install Water
Trim).
7. For boilers with tankless heaters, install the
tankless heater manifolds according to Figure 28.
Water heater manifolds must be removable to
allow for heater repair and replacement, also for
the removal of jacket right side panels for boiler
repair and inspection. Therefore, the recommended
use and placement of shut off valves and unions
on all manifold assemblies is crucial to providing
easy access for future servicing.
Les collecteurs de chauffe-eau doivent être
amovibles pour permettre la réparation et le
remplacement du chauffe-eau, ainsi que pour
le retrait des panneaux latéraux droits de la
chemise pour la réparation et l'inspection de
la chaudière. Par conséquent, l'utilisation et le
placement recommandés des vannes d'arrêt et
des raccords sur tous les ensembles de collecteur
sont essentiels pour fournir un accès facile pour
les futurs entretiens.
I.
STEAM BOILERS - INSTALL STEAM TRIM
Items for steam trim are located in the steam trim
carton (except for the separately ordered low cutoff and
tankless heater control). Table IV and Figure 29 show
the proper tappings for each item.
1. Install the gauge glass set.
2. Install the low water cutoff. When using two
LWCO's on a V11H steam boiler, a probe type
LWCO cannot be used in conjunction with a float
type. See Figure 39 for illustration pump controller
and auxillary manual reset float LWCO. For other

Advertisement

Table of Contents
loading

Table of Contents