Section Ii - Cast Iron Block Assembly (Knockdown Only) - Burnham V11H Series Installation, Operating And Service Instructions

Commercial cast iron boiler
Table of Contents

Advertisement

SECTION II - CAST IRON BLOCK ASSEMBLY
FACTORY ASSEMBLED SECTIONS - The
A.
assemblage should be set in the proper location as
outlined in Section I. Lifting arrangement and weights
are given in Figure 4.
THEN THE DRAW-UP ROD NUTS SHOULD BE
LOOSENED UNTIL FINGER TIGHT AND THEN
TIGHTENED ½ TURN WITH A WRENCH. Now
proceed to Paragraph C of this section, "HYDRO-
STATIC TEST."
FIELD ASSEMBLED SECTIONS - If the boiler
B.
was ordered to be field assembled, follow the assembly
procedure outlined on the following pages.
1. ASSEMBLY OF SECTIONS (MANUAL
DRAW-UP)
These sections are designed to be drawn together
one section at a time using the 11" long draw-up
rods (provided) and ordinary hand tools.
Tools required:
(1) ¾" Drive Ratchet
(1) 1¼" Socket
(1) 1¼" Combination or Open End Wrench
(1) Can Thread Cutting Oil or Grease
WHEN ASSEMBLING SECTIONS WITHOUT
HYDRAULIC DRAW-UP EQUIPMENT,
NEVER ASSEMBLE MORE THAN ONE
SECTION AT A TIME.
a. Place the rear section in its approximate final
position, as outlined in Section I and support it
with a suitable prop. See Figure 5.
16
Figure 4: Lifting Instruction
Figure 5: Positioning of Back Section

Advertisement

Table of Contents
loading

Table of Contents