step 2. On 8 thru 18 section boilers, locate
intermediate top panel(s) and install in order of
assembly shown in Table XI. Position panel
between outer top corner panes. Slide forward
to engage locking tabs into slotted openings on
previously installed panel, see Figure 30b. Secure
rear flange with two (2) #8 x ½" lg SMS. Repeat
until intermediate panels reach supply manifold.
step 3. Position jacket rear top panel between outer
top corner panels behind supply manifold. Slide
forward until locking tabs are engaged into slotted
openings on previously installed panel. Secure
panel to rear clips on outer corner panels with two
(2) #8 x ½" lg. SMS. Refer to Figure 30c.
L.
Install Burner Swing Door (BSD) on Block Assembly
hinges, see Figure 31. Move BSD to front of boiler.
Position door on the Floor, standing up, perpendicular
to front of boiler (full open position).
Figure 0b: Install Jacket Top Panels
- Viewed From Rear
Figure 0c: Install Jacket Rear
Top Panel -
Viewed From Rear
Figure 1: Install Burner Swing Door
7

Advertisement

Table of Contents
loading

Table of Contents