YASKAWA Solectria PVI 25TL-208 Installation And Operation Manual page 33

Commercial 1000vdc string inverters
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
Referring to Figure 3-9, drill holes at the marked positions with a 10mm (0.4in.) drill and put the M8 expansion
tubes, labeled as ①, into the holes; assemble and fasten the mounting brackets, labeled as ②, with the M8x25
assembling bolts, labeled as ③, supplied with the accessory kit. Tool: Electric drill (Ф10mm/0.4in. head), 13mm
wrench 240 in-lbs.
Mounting the Bracket to PV Racking: the M8 nuts are not provided in the Accessory Kit. Tools Required: No. 13
wrench(es)
Concrete Wall Mount: Drill holes at the marked positions with a 0.4in. (10mm) masonry bit and insert M8
Expansion Anchors into the holes (expansion anchors not provided); Fasten the Mounting Bracket with the M8x25
Assembling Bolts supplied with the Accessory Kit. Figure 3-8 and Figure 3-9. Tools Required: Electric drill
(Ф10mm/0.4in. masonry bit), No. 13 wrench
DOCR-071030-A (10/7/2022)
INFO ✔
Figure 3-8 Drill holes, set Anchors, and tighten Assembly Bolts
1
2
3
Figure 3-9 Secure the Mounting Bracket
Page 33 of 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents