Check the air vent grate regularly to make sure it is not blocked. Clean the grate with a soft brush or vacuum
cleaner attachment if necessary. The frequency of this cleaning depends on the installation environment.
Replace the Cooling Fans
If the internal temperature of the inverter is too high or abnormal noise is heard, assuming the air vent is not
blocked and is clean, it may be necessary to replace the external fans. Please refer to Figure 8-1 for replacing the
cooling fans.
 Use a No. 2 Phillips head screwdriver to remove the 10 screws on the fan tray (6 screws on the upper fan
tray, and 4 screws on the lower fan tray).
 Disconnect the waterproof cable connector from the cooling fan.
 Use a No. 2 Phillips head screwdriver to remove the screws. Each fan is attached to the fan tray with 4
screws.
 Attach the new cooling fans on the fan tray and screw into place. Fasten the cable on the fan tray with
cable ties.
o Torque value: 0.8-1N.m (7.1-8.91in-lbs)
 Install the assembled fan tray back on the inverter and secure with the original screws.
o Torque value: 1.2N.m (10.6in-lbs)
DOCR-071030-A (10/7/2022)
4
5
Page 111 of 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents