Furuno CSH8LMK2 Installation Manual page 17

Color scanning sonar
Table of Contents

Advertisement

12. Fix anti-vibration stays to the retraction tank.
Anti-vibration stays should be fixed to directions of ship's bow – stern and port –
starboard.
Fixing anti-vibration stays to retraction tank
13. Orient the main shaft so that the bow mark faces ship's bow and fix it securely with
the shaft retainer.
Loosen shaft retainer
and rotate main shaft
so that the bow mark
faces ship's bow.
Bow mark
Bow
Tighten bolts fixing shaft retainer for
torque of 35 to 38 N m.
If torque is less than the above, water
leakage may occur because the shaft
may loosen and fall.
Orienting the main shaft
1. MOUNTING
Anti-vibration stay
WARNING
1-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csh-8lmark-2

Table of Contents