Furuno CSH8LMK2 Installation Manual page 11

Color scanning sonar
Table of Contents

Advertisement

When the retraction tank is made locally, finish it so
that the welding bead does not protrude on the inner
surface of the tank. The tank guide will hit the bead,
causing motor born-out. The gap between the tank
and tank guide is 1 mm. Also when installing the
tank, orient the welding bead so it faces the port or
starboard direction.
1.1.2
Installation of the retraction tank
The retraction tank is 1000 mm in length as supplied. Shorten the tank referring to the
table below so the transducer fully protrudes beyond the keel when it is lowered. Refer
to the installation procedure at the back of this manual for details.
Cut
Note: It is not necessary to cut the main shaft when there is enough space above the hull unit.
Tank Installation Method
In case of 1000 mm tank
750 mm (600 stroke,
shaft length: 1300 mm)
550 mm (400 stroke,
shaft length 945 mm)
How to shorten the retraction tank
In case of 1000 mm tank
750 mm (600 stroke,
shaft length: 1300 mm)
550 mm (400 stroke,
shaft length 945 mm)
Cut
Cut along the hull bottom.
1. MOUNTING
Welding Bead
Welding Bead
Bow
Tank guide
1-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csh-8lmark-2

Table of Contents