Final Check-out

The final check-out procedure consists of:

Final Check-out Setup

After the completion of the MTS installation,
procedure ensures the proper operation of the MTS.
Procedure 4-15 How to Perform the Cabinet Final Check-out Setup
Switch to OFF the Power Supply Unit.
1
Verify that the connections on all modules and on the junction panel are secure and make good
2
contact. Make any necessary adjustments.
If a backup battery is used, check if the wires on plus (+) and minus (-) poles make good contact
3
and if appropriate, check that the temperature sensor is attached.

Expansion Cabinet Power-Up

Procedure 4-16 How to Power-Up MTS and Expansion Cabinet
Check connections at Power Supply Unit and if applicable at the backup battery.
1
Set switch to ON position.
2
Watch the following LED indicators to monitor the PSU inputs and outputs during the startup
3
procedure:
6802800U74-N September 2009
Final check-out setup
Expansion Cabinet power-up
Cabinet power-up procedure is arranged to prevent MTS damage in the case of an
equipment or installation defect.
Make certain the switch on the Power Supply Unit is switched OFF before
proceeding. Turn switch to ON only when directed in below procedure.
performProcedure
Final Check-out
4-15. This final check-out
4-63